? Ontario Hydro – Definition and Explanations
Introduction
Ontario Hydro logo |
|
creation | May 14, 1906 |
---|---|
Don’t go missing | 1er April 1999 |
Main characters | Sir Adam Beck |
Legal form | Crown Corporation |
head office | ![]() |
Shareholders | Government of Ontario |
activities) | Electricity |
products) | productionelectricity (It is a physical phenomenon due to different electric charges of electric current…) transportation (Transportation is the act of moving something or someone from one place to another, most often…) electricity Electricity distribution |
edit it |
The Ontario Water Commission (English: Ontario Hydroelectric Power Commission), is officially recognizedOntario Hydro Since 1974, a crown corporation of the Government of Ontario, incorporated on May 14, 1906. Energy Commission Act. The company was formed to run power lines from private hydroelectric plants in Niagara Falls to supply municipal power grids.
The company quickly developed its production facilities by acquiring private power plants and then designed and built its own hydroelectric plants. After developing the full potential hydraulic (Hydraulics refers to the branch of physics that studies fluids. So…) The first Ontario Hydro of the year opened thermal power plant (A thermal power plant is a power plant that produces electricity…) Coal in the 1960s, then nuclear power plants in the 1960s and 1990s. America (America is a separate continent from Asia in the west and…) from North (North is the cardinal point against south.) In the 1990s.
In 1999, Ontario Hydro was dissolved by the Mike Harris government to split into 5 entities as part of reforms to the provincial electricity market.
History

Adam Beck is the first chair of the Ontario Hydroelectric Commission. Sir James P. Whitney, a minister without portfolio in the government, created Beck network (A computer network is a set of devices connected to each other to exchange information…) public power transmission main voice horse (The horse (Equus ferus caballus or equus caballus) is a large herbivorous mammal and…) fight. In 1907, Toronto City Council approved the development and public ownership of hydroelectric power, thanks to the efforts and leadership of Beck’s ally William Peyton Hubbard.
The son of a freed slave from Virginia, Hubbard was elected to Toronto City Council in 1894. Whole (In set theory, a set intuitively defines a collection…)Beck and Hubbard make a formidable team, the former defending the state public system and the latter the municipal system.
The first transmission lines of the commission begin to transmit municipalities Southwest (Southwest is the half direction between the south and west cardinal points. The…) Ontario in 1910. He was knighted in 1914 for his contribution to the electrification of Ontario.
In the 1920s, the commission began manufacturing and distributionenergy (Energy in common sense refers to anything that allows you to do work, energize, etc.) produced by its facilities when it receives a government mandate to electrify rural areas. In addition to building its facilities, the company continues its programpurchase (In general, acquisition is the act of acquiring or acquiring information…) transmission lines and power plants of major private players in the industry. In 1948, HEPCO converted most of its system from 25 to 60 Hz. Fort Eriefor south (South is the cardinal point against north.) Continued to use Niagara Falls frequency (In physics, frequency generally refers to the measurement of the number of times a… Until 1966, 25 Hz allowed protection from this region 1965 Blackout in North America.
Business development

Sir Adam Beck Hydroelectric Complex in Niagara Falls.
In the 1950s, the Commission operated an integrated network at the state level. Full network integration with some exceptions autonomous networks (Autonomous networks are a type of network…) isolated, will be completed in 1970.
In 1953, Ontario Hydro began connecting its system with that of other utilities, beginning with the Keith-Waterman line. 230kV connecting it Detroit (Detroit (English: Detroit, API: [d??t????t]) is the capital city of Michigan…) Edison, in the United States. After a short time, other mutual relations with the State were established New York (New York, in English New York City (officially, City of New York) to distinguish it…).
In the 1960s, Ontario Hydro commissioned its first high-speed lines. tension (Tension is a stretching force.) At 500 kV designed between 1960 and 1967. These new lines allow power to be transmitted from hydroelectric plants in the province’s north to consumer markets in Toronto, London and Ottawa. The network will be expanded in the 1970s and 1980s.
Due to increased needs in the post-war period, Ontario Hydro continued to increase production by building several hydroelectric plants. The first coal-fired power plants were also built during this period. The expansion of coal-fired power generation continued in the 1960s and 1970s, but was accelerated by the development of an ambitious program. nucleus (The term nuclear energy has two meanings depending on the context 🙂.
Commissionhydroelectric power (Hydroelectric power or hydroelectricity is electricity obtained by…) Ontario was officially named Ontario Hydro In 1974, it was identified with a nameuse it (Usage is the act of using something.) for a while time (Time, by man… already.
Nuclear production

Since the late 1950s, the company has been engaged in the development, design and construction of CANDU reactors. First reactor (A reactor may refer to:) commercial (A salesperson is a person whose business is related to sales.)Douglas Generating Station Point (graphic)It will be commissioned in 1965.
After that, the program starts massive (Can be used as a mass word 🙂 Construction of a nuclear power plant, beginning with the construction of the first four reactors at the Pickering nuclear plant, followed by the construction of the Bruce nuclear plant and another block of four reactors at Pickering. In the late 1980s, Ontario operated one of the largest nuclear generating fleets the world (May refer to the word world 🙂.
Construction of a third nuclear power station at Darlington, about 60 kilometers (The meter (symbol m, from the Greek metron, measure) is the basic unit of length of the system…) East of Toronto will be marked by a series of delays and significant cost overruns. The Bill Davis government authorizes construction of four reactors to be completed in 2003 at a cost of $2.5 billion. Four plants would eventually be commissioned between 1989 and 1993 and their cost common (Total is an absolute quality without exception. In accounting terms, a…) increased to 14.4 billion.